Road Crack Sealing Work Begins Today | Transportation

Title (Max 100 Characters)

Road Crack Sealing Work Begins Today

PORTLAND, Maine – Beginning today, April 18th and continuing through the month, crews will conduct day and nighttime crack sealing along major arterials and residential streets throughout Portland. Work on residential streets will be done during the day and major arterials work will take place overnight. Crack sealing utilizes a rubberized petroleum-based material that fills in the separation gaps typically found on pavement. This repair work extends the overall lifespan of the street and is an effective cost-saving measure. If left unchecked, water and debris can infiltrate these cracks and cause a great deal of damage due to frost and settling. While the work is underway, commuters can expect delays.


Portland Deals

Portland Businesses